What should construction personnel pay attention to

What should construction personnel pay attention to

Detailed construction process: 1. According to the drawing plan, prefabricated all steel components produced on site for all-round derusting, polishing, and painting the second pass of anti-rust paint; 2. Measure the highest point in the ho...

Measures to prevent deviation of steel structure installatio

Measures to prevent deviation of steel structure installatio

Sometimes, because the preparatory work is not done well, the steel structure will have deviations during installation. Once deviation occurs, it may lead to safety accidents during the construction process. So, how should we prevent this f...

Construction method in construction of steel structure grid

Construction method in construction of steel structure grid

1. High-altitude assembly method The steel mesh frame is installed by the high-altitude assembly method, which is to first assemble the assembly bracket at the design position, and then use the crane to hang the net frame components (or blo...

Calculation method and rules of steel structure grid enginee

Calculation method and rules of steel structure grid enginee

1. Calculate the weight of the steel according to the size of the design diagram, without deducting the weight of the holes, trimming edges, and limbs, and the weight of welding rods, rivets, bolts, etc. will not increase. 2. Irregular or p...