Detailed construction process: 1. According to the drawing plan, prefabricated all steel components produced on site for all-round derusting, polishing, and painting the second pass of anti-rust paint; 2. Measure the highest point in the ho...
Sometimes, because the preparatory work is not done well, the steel structure will have deviations during installation. Once deviation occurs, it may lead to safety accidents during the construction process. So, how should we prevent this f...
1. High-altitude assembly method The steel mesh frame is installed by the high-altitude assembly method, which is to first assemble the assembly bracket at the design position, and then use the crane to hang the net frame components (or blo...
1. Calculate the weight of the steel according to the size of the design diagram, without deducting the weight of the holes, trimming edges, and limbs, and the weight of welding rods, rivets, bolts, etc. will not increase. 2. Irregular or p...
Tel:0757-81185133/85578889 Fax:0757-81185888 E-mail:dcgg@dcshelf.com Address:Side of Xiedie Bridge, Guidan Road, Dali, Nanhai, Foshan
Copyright © Foshan Nanhai Xiebian Dachang Steel Structure Co., Ltd. Guangdong ICP No. 18035689-1
织梦58
0757-81185133/85578889